Trades Pro 5pc Bolt Remover & Damaged Screw Extractor
was $10.95 NZD
now $10.00 NZD
Ideal for quickly and easily removing broken, damaged or embedded screws and bolts
Ideal for quickly and easily removing broken, damaged or embedded screws and bolts
1/4” Hex shank, made of high-speed steel for longer life
The 5-piece bolt and screw extractor set works with any variable speed, reversible drill and any screw size or bolt
Suitable on various head types: Phillips, Slotted, Hex, Torx, Robertson, Pozi etc
Includes #0, #1, #2, #3, #4
Size Guide:
#0 Extractor – Bolt/Screw Š< 6mm
#1 Extractor – Bolt/Screw Šapprox.6mm
#2 Extractor – Bolt/Screw Šapprox.10mm
#3 Extractor – Bolt/Screw Šapprox.12mm
#4 Extractor – Bolt/Screw Šapprox.14mm)
Not for use with impact drivers
Not recommended for drywall screws

